Testing Overview

Testing capacity dimensioning and effect on mobile network

Abstract: The client had planned to increase capacity for number of simultaneous voice calls for an operational satellite network using its solutions in thw ME region. The need was to look for a partner for testing the enhancement before going live. The main need was to test Secondary Gateway components which would handle the enhanced call loads.

Customer benefit

  • Offshore development led to cost savings
  • Complete ownership meant customer can focus on other key tasks
  • A time bound delivery led to reduction in time to market
  • Integration Testing at Client in US and then at Operator's network in ME region
  • Proximity of HSC, India to Operator’s location in ME helped meet the support effectively

GS: Ground Station
NSS: Network switching Subsystem
TCS : The Traffic Control System (TCS) responsible for real-time assignment and release of resources (frequency, timeslot, and power) on a per-call basis. It was enhanced to support 6000 simultaneous call.

HSC Solution

  • Took responsibility for Integration of components of Secondary Gateway Station.
    • End-to-End System integration testing and field integration testing involving
      • system integration testing
      • System validation testing
      • factory acceptance testing
      • field installation & commissioning

Back